Location & Infrastructure

STRATEGIC CONNECTIVITY
SYNCHRONIZED INFRASTRUCTURE

With a favorable location in the Ba Ria – Vung Tau area, the project connects flexibly with seaports, airports, national highways, expressways and key economic and service centers.

View connectivity map Register for a site visit

CENTRAL LOCATION
MULTIMODAL CONNECTIVITY

The project lies in the dynamic economic region of Ba Ria – Vung Tau, with direct connections to the road network, deep-water seaports and an international airport.

This location creates optimal conditions for production, import–export, logistics and expert travel, while giving businesses easy access to urban areas, services and high-quality tourism.

CONNECTIVITY MAP
OF THE STRATEGIC REGION

The map shows the project’s connections to important transport hubs, urban areas, logistics and tourism destinations in the region.

KEY CONNECTION POINTS

Cai Mep – Thi Vai International Port 30 km
Phuoc An Port 40 km
Long Thanh International Airport 55 km
Ba Ria City 12 km
Vung Tau City 25 km
Ho Chi Minh City 60 km
Ho Tram Tourist Area 15 km

CONNECTIVITY ADVANTAGES
FOR INVESTMENT

THREE CONNECTIVITY AXES
CREATING DISTINCTIVE ADVANTAGES

URBAN AMENITIES
AND NEARBY SERVICES

Beyond its logistics advantages, the project is close to major urban centers and tourist areas, meeting the living, accommodation, healthcare, education and leisure needs of experts, workers and partners.

Register for an on-site survey

INFRASTRUCTURE SYSTEMS
FOR STABLE OPERATION

READY FOR AN
ON-SITE VISIT

Our specialists are ready to advise on connecting routes, distances to seaports, airports, urban areas and infrastructure suited to your company’s needs.

    CONTACT THE INVESTMENT DEPARTMENT

    Please leave your details and our specialists will contact you as soon as possible.